Business Continuity & Disaster Recovery Plan

business-continuity.md·ISO · A.5.29/30

Generate a Business Continuity and Disaster Recovery Plan with a business impact analysis, RTO/RPO targets, and tested recovery procedures.

What's in the policy

Keeps the business running through disruptions with defined RTO/RPO and recovery procedures.

✓Business impact analysis (BIA)
✓Recovery time and recovery point objectives (RTO/RPO)
✓Backup, restore, and failover procedures
✓Disaster recovery sites and redundancy
✓Crisis communication plan
✓Testing and review schedule
Mapped toISO 27001 (A.5.29/30)SOC 2 (A1.2)HIPAA

What the document actually says

These are the standing requirements every generated copy of the document is written from — the clause text itself, not a description of it. The document you receive is drafted on top of them: it expands on them and fills the current-state detail from your intake, and the generator is instructed to keep them, to state them fully, and never to claim a certification or invent a fact you did not supply.

Recovery objectives, stated as a number instead of a bracket

- Recovery Time Objective (RTO) — the maximum tolerable time to restore a service. Default target: 24 hours for critical customer-facing services (to be confirmed per system). - Recovery Point Objective (RPO) — the maximum tolerable data loss. Default target: 4 hours for critical data stores (to be confirmed per system). Objectives are reviewed annually and adjusted to the business's tolerance and contractual commitments.
SOC 2 A1.2 · ISO 27001 A.5.29/30 — the document ships a stated default target for each objective instead of an empty bracket, and marks both 'to be confirmed per system' rather than presenting a guess as a settled number.

What has to be true of every backup

- Critical data is backed up on a regular, automated schedule (at least daily for production data stores). … - Backup restores are tested at least quarterly to verify integrity and recoverability; test results are documented. - Backup retention meets business and regulatory requirements and is documented.
SOC 2 A1.2 · ISO 27001 A.8.13 — a stated cadence instead of 'regularly', a restore test on a named clock instead of an assumption that backups work, and a documented retention rule attached to each one.

What resilience requires beyond a backup

- Production infrastructure uses redundancy (e.g., multi-AZ, managed failover) appropriate to the RTO/RPO targets. - Documented recovery runbooks exist for critical systems and are kept current. - A continuity/DR exercise is conducted at least annually, and lessons learned are folded back into the plan. …
SOC 2 A1.2 · ISO 27001 A.5.29, A.5.30 — redundancy is sized to the stated targets rather than assumed adequate, a runbook has to stay current rather than exist once, and the annual exercise is required to change the plan, not just confirm it.
AWS multi-AZ + RDS automated backups + S3 cross-region replication

Filled in for a real stack

Placeholder

Backup process: To be confirmed. Hosting / infrastructure: To be confirmed. Cloud provider: To be confirmed.

Resolved

Backup process: RDS automated backups nightly with point-in-time recovery, plus a periodic export to S3 with cross-region replication. Hosting / infrastructure: containers on ECS spread across two AWS availability zones behind a load balancer. Cloud provider: AWS, primary region us-east-1 with the replica in a second region.

What the auditor asks for alongside it

What actually happens when a critical system goes down, not just that a policy exists.
Your recovery runbook for that system, read against Section 5. The document requires a documented, current runbook for every critical system and redundancy sized to the recovery targets — the runbook is the artifact a reviewer asks to see, not a description of one.
The answer a customer gets when they ask how you back up their data.
The drafted questionnaire response to a backup question, built from the backup process you describe at intake and pointed back at this plan. It states your process, not a number — the recovery-objective defaults live in the document itself, not in anything the questionnaire pulls from intake.
Where the systems this plan is supposed to recover actually live.
The system architecture diagram, generated from the same hosting setup and cloud provider you give at intake. It draws your data stores inside a named trust boundary, so 'critical systems' in this document is a specific set of boxes on a diagram, not a phrase a reviewer has to take on faith.
Proof the annual continuity exercise happened, and what it found.
Your tabletop or failover-test notes, dated within the last year. The plan requires the exercise and requires lessons learned to be folded back into it — an exercise that changed nothing afterward is the outcome a reviewer treats as untested.

Where these documents go stale

A business continuity plan is written against an infrastructure snapshot, and infrastructure is the part of the company that changes without a change request against this document. A managed database gets a read replica in a second zone; nobody updates the resilience section to say so. A backup export moves from a scheduled job on one box to a managed service, and the process you described at intake no longer matches what actually runs. The default recovery targets are marked 'to be confirmed per system' precisely because a real per-system number takes work nobody has gotten to, so the default quietly becomes the answer by default rather than by decision. The clause most likely to be false on any given day is the restore-test bullet: a quarterly test that slipped a quarter is invisible until the day a restore is actually needed. Re-validate by re-running the exercise, confirming the runbook still matches the infrastructure, and revisiting the recovery targets per system instead of leaving the default standing indefinitely.

From intake to enterprise-ready in three moves
01

Tell us about your stack

Answer a short intake — cloud, data types, tools. No agents to install.

02

We generate a tailored draft

Not a blank template: a document written for your environment and pre-mapped to controls.

03

Review, edit, and share

Export it or attach it straight to an enterprise security review or questionnaire.

Business Continuity & Disaster Recovery Plan, answered

What is a business continuity and disaster recovery plan?

It states how an organization keeps operating and restores its technology after a disruption — an outage, an attack, a lost dependency. It sets recovery objectives, requires tested backups, and specifies the redundancy and runbooks that get a critical system back online, rather than leaving the response to be worked out during the incident.

What are RTO and RPO, and where do the numbers come from?

Recovery Time Objective is the longest a service may be down; Recovery Point Objective is the most data you can afford to lose. The plan ships a default — 24 hours and 4 hours for critical systems — marked 'to be confirmed per system', so you start from a stated position instead of a blank one.

Does SOC 2 require a business continuity and disaster recovery plan?

In substance, yes. SOC 2's Availability criteria, A1.2 in particular, expect a plan for recovering critical systems, and ISO 27001 covers the same ground under A.5.29 and A.5.30. Auditors ask for the written plan, the backup and restore-testing evidence behind it, and proof that a continuity exercise has actually been run.

How often do backups have to be tested?

Restores are tested at least quarterly, not just taken. The plan requires the test to confirm a backup is actually recoverable and intact, not only that a backup job completed, and requires the result to be documented — an untested backup is treated the same as no backup at all.

What's the difference between this and the Backup & Recovery Policy?

They're the same document. Backups are a section of this plan rather than a separate file — cadence, encryption, restore testing, and retention all live here. A dedicated backup page exists because people search for it on its own, but generating it produces this full continuity and recovery plan, not a standalone backup policy.

Does this cover redundancy and failover, or only backups?

Both. Backups are one section; a separate section requires redundancy such as multi-AZ or managed failover sized to the recovery targets, current runbooks for critical systems, and an annual exercise that feeds lessons learned back into the plan. A backup alone does not satisfy this document.

How does Pentest Today generate the policy?

Answer a short intake about your stack and we generate a tailored draft — not a blank template — pre-mapped to the controls your framework requires. You review, edit, and export it.

Can I edit the generated policy?

Yes. Every document is a starting draft you can edit, brand, and export. It's written to be review-ready but stays fully under your control.

Free · no account

Start your Pentest

Our agent swarm and human experts test your endpoints and deliver an audit, fast.

Generate your full security policy pack.

Get the business continuity & disaster recovery plan plus everything else an enterprise security review asks for — generated from your real environment.